Why Pre-Shipment Testing Matters for FRP Spray Towers
When you order an FRP spray tower, factory testing is critical to guarantee stable performance. At Lanzhi Environmental Technology, every FRP spray tower and scrubber goes through a complete factory testing and pre-assembly process before packed and shipped.
Our Pre-Shipment Installation & Testing Workflow




1. Full Visual & Dimensional Inspection Before any testing begins, our production team checks the tower shell, flanges, nozzles, inlet/outlet connections, and internal packing supports. We verify diameters, heights, flange hole patterns, and mounting dimensions against your order drawing. Any surface defects, gel coat issues, or uneven edges are corrected at this stage.
2. Internal Component Assembly We assemble the internals in the factory so you can see how everything fits before shipment:
- Spray headers and nozzle banks installed and aligned
- Packing support grids and liquid distributors checked for level
- Demister pads positioned and secured
- Access doors and manholes opened and closed to confirm proper sealing
3. Water Leak & Pressure Test The tower is filled with water or connected to a low-pressure air line to test:
- Flange connections and gasket seals
- Nozzle threads and spray header joints
- Drain outlets and overflow connections
- Tower shell integrity at welds and laminate seams
Any seepage is repaired immediately and retested before moving forward.
4. Spray Pattern & Flow Verification We run water through the spray system to confirm:
- Every nozzle produces an even, full-cone spray pattern
- No blocked or misaligned nozzles
- Liquid coverage reaches the full cross-section of the tower
- Drain flow matches design circulation rate
This step ensures the scrubber will absorb fumes and dust efficiently once connected to your exhaust system.
5. Supporting Components Check For units including recirculation pumps, piping, valves, or control panels, we verify:
- Pump rotation direction and priming
- Valve handle operation and position marking
- Electrical box labeling and cable gland integrity
- Pressure gauge and level indicator functionality
6. Disassembly for Safe Shipping After testing is approved, we partially disassemble the tower for container-friendly loading:
- Loose internals (nozzles, packing, demister sections) are bagged and labeled
- Flange faces are protected with plywood or foam covers
- Tower sections are strapped on steel or wooden pallets
- All bolts, gaskets, and installation hardware are packed separately with a labeled parts list
A photo report of the disassembled packing is provided with your shipment documents.
What You Receive
With every spray tower order, we send:
- Factory inspection photos and short videos of the water test
- General arrangement drawing with marked installation dimensions
- Recommended foundation layout and anchor bolt positions
- Operation & maintenance manual in English
- List of spare parts available for future orders
Our Commitment
We believe that quality control should happen before the container leaves China — not on your job site. By completing assembly and testing in our Hebei factory, we reduce your installation risk, shorten commissioning time, and make sure your FRP scrubber starts protecting your air emission system the day it arrives.